Contemporary high-rise residential community beside a landscaped arrival boulevard
Kannur · Chikkagubbi · Bengaluru East

Sobha Chikkagubbi Apartments near Hennur Road

Explore Sobha Chikkagubbi apartments near Hennur Road in Bengaluru East: a proposed 50.45-acre mixed-use community with 4,463 planned homes, nine configurations and current project details on request.

Project details
Project detail Current information
Project type Mixed-use development with residential apartments and associated commercial components
Location Kannur and Chikkagubbi, Bidarahalli Hobli, Bengaluru East
Land area Approximately 50.45 acres
Planned homes 4,463
Published
Modified

Request project details

Artist’s impression

Sobha Chikkagubbi Project Overview

Sobha Chikkagubbi is a proposed mixed-use community across Kannur and Chikkagubbi villages in Bengaluru East. Current project information describes a site of approximately 50.45 acres, equal to about 20.42 hectares, with 4,463 planned homes and 13 towers or blocks rising up to 42 floors. The programme combines residential apartments with a separate office, service-apartment, retail and food-oriented precinct shown in the project plan.

For buyers searching for Sobha apartments in Chikkagubbi or Sobha apartments in Kannur, the most useful starting point is the scale of the residential mix. The documents list one-bedroom serviced apartments, regular 1 BHK homes, three distinct 2 BHK formats, two 3 BHK formats and two 4 BHK formats. The 2 BHK choices include Luxe, Grande and a home-office format; the larger homes are divided into Luxe and Grande formats, with the 4 BHK labels also distinguishing three-bath and four-bath layouts.

The project data also refers to a floor-area ratio of 3.396, approximately 37% green cover and a parking requirement of 5,029 spaces. These planning figures help describe the proposed intensity and site programme, but they do not tell a buyer which tower, stack, view, carpet area or parking allocation may be offered. Those details should be matched to the latest tower-specific plan, area schedule and allotment documents.

A notable document discrepancy needs to remain visible. The nine configuration rows add up to 4,397 homes, including 100 serviced apartments, while the overall project total is stated as 4,463 units. The difference is 66 units. It may reflect a revision, categorisation issue or incomplete schedule, but the current documents do not resolve it. Buyers should request a reconciled unit schedule before treating either number as final inventory.

A Q2 2027 launch window and a 48-month completion period appear only as research projections derived from prior builder cadence; they are not announced or confirmed project dates. The official project name and Karnataka property-registration identifier are not published on this site. Current Sobha Chikkagubbi project details should therefore be checked against the latest registration record, sanctioned plans and phase-specific sales documents.

Sobha Chikkagubbi project snapshot

Current proposed project details
Project detailProject information
Project typeMixed-use development with residential apartments and associated commercial components
LocationKannur and Chikkagubbi, Bidarahalli Hobli, Bengaluru East
Land areaApproximately 50.45 acres
Planned homes4,463
Project name used hereSobha Chikkagubbi
Information reviewed17 August 2026
Proposal typeNew mixed-use development proposal
Primary planning useResidential Main within a mixed-use programme
Project companySOBHA LIMITED
Approving authorityBBMP
Towers / blocks13
Floor levelsUp to 42 floors
Proposed FAR3.396
Approximate green cover37%
Parking requirement5,029 spaces at project level
Configuration mixNine residential configuration labels
Configuration schedule4,397 homes across listed rows versus 4,463 overall — 66 units unresolved
Proposed social infrastructureEducation, banking, communication, medical, recreation and business uses
Master-plan programmeResidential blocks, commercial and service-apartment precinct, amenity block, future-development parcel and open spaces
Connectivity referencesTanisandra Railway Station and Kempegowda International Airport
Planning launch estimateQ2 2027 research projection — not an announced date
Planning completion estimate48 months research projection — not a confirmed commitment
Base priceTentative: Rs 1.86 Cr (approx. 1,940 sq ft; excluding stamp duty and registration)
Current availability4,463 is planned supply, not released inventory
RegistrationPending

Sobha Chikkagubbi Master Plan

The Sobha Chikkagubbi master plan organizes the long site into several readable zones. At the western end, the drawing identifies an office, service-apartment, retail and food-oriented precinct. Residential Blocks 1–5 run along the upper spine, while Blocks 6–12 occupy the southern and eastern circulation loop. The plan separately marks an amenity block and a large future-development parcel, allowing buyers to understand which areas are assigned to the current residential clusters and which areas may form a later planning stage.

The drawing also identifies civic-amenity land, parks, landscaped open spaces, internal roads, visitor parking, basement ramps and principal access points. A lake-edge relationship and water-related buffer areas are part of the wider site context. These elements matter when comparing a preferred tower because an apartment's outlook, access route and distance from shared facilities depend on the final tower and landscape plan, not simply the overall project acreage.

The project documents refer to approximately 37% green cover, and the source schedule includes a broad tree-planting programme. That figure describes the proposed project-level landscape allocation; it does not guarantee a particular garden view, private open space or completed landscape condition for an individual home.

Use this Sobha Chikkagubbi master plan section to shortlist questions before requesting the latest drawing: confirm the selected block and wing, the current access gate, adjacent future-development land, the position of civic and amenity parcels, basement entry points, fire-tender circulation, visitor parking and the relationship to nearby water features. The latest issued plan should also be checked for revisions to boundaries, road widths, building footprints and open-space calculations.

Sobha Chikkagubbi Floor-Plan Studies

The Sobha Chikkagubbi floor-plan schedule lists nine residential labels: 1 BHK Serviced Apartment, 1 BHK, 2 BHK Luxe, 2 BHK Grande, 2 BHK + Home Office, 3 BHK Luxe, 3 BHK Grande, 4 BHK Luxe with three bathrooms, and 4 BHK Grande with four bathrooms. The schedule assigns 100, 301, 318, 310, 310, 1,428, 1,298, 166 and 166 homes respectively. Together these rows total 4,397, which does not reconcile with the separate overall total of 4,463 planned units.

The 1 BHK choices may suit buyers prioritising a compact home or serviced-apartment format. The three 2 BHK labels provide the broadest middle segment: Luxe and Grande indicate different planning propositions, while the home-office label explicitly reserves an additional work zone. The 3 BHK Luxe and Grande groups account for most of the listed schedule. At the upper end, the two 4 BHK labels distinguish bathroom counts as well as the Luxe and Grande naming. No project-specific carpet area, saleable area, balcony area or room dimension is published for these labels.

Each 3D card below is a generic planning concept created to compare room relationships and furniture zoning. It is not the actual Sobha Chikkagubbi floor plan and does not establish area, dimensions, orientation, stack, wing, view or availability. A buyer comparing Sobha Chikkagubbi 1 BHK, 2 BHK, 3 BHK or 4 BHK options should request the current unit drawing and area statement for the exact tower and stack.

Before choosing a layout, compare entrance privacy, living-dining proportions, kitchen utility access, bedroom separation, bathroom access, balcony placement, storage walls and home-office usability. Then match the drawing number and revision date across the floor plan, area schedule, cost sheet and agreement. This prevents a configuration name from being mistaken for one standard layout across every block.

Artist’s impression

Proposed Social Infrastructure

Current project information proposes social-infrastructure provisions spanning education, banking, post and communication services, medical uses, recreation and business establishments. These are broad programme categories rather than a final buyer-facing Sobha Chikkagubbi amenities list. The master plan also marks a separate amenity block, civic-amenity land, parks and open-space areas, but it does not establish the final name, specification, access rule or delivery phase of each facility.

The technical schedules add project-scale infrastructure context. They describe an on-site sewage-treatment system using an activated-sludge process, dual plumbing, and reuse of treated water for functions that include flushing, landscape irrigation, car washing and floor washing. The documents also refer to rainwater-harvesting provision, a significant green-cover allocation and a planned tree palette. These are proposed systems and landscape measures, not evidence that any particular facility is operating or available to residents today.

When reviewing Sobha Chikkagubbi amenities, request the current project-and-phase facility schedule and verify which facilities belong to the selected phase, whether access is shared across residential and commercial components, the expected handover sequence, operating charges and any membership conditions. Also compare the issued landscape plan, services plan and amenity-block drawing. This makes the discussion more useful than relying on a generic clubhouse or recreation list.

Sobha Chikkagubbi Price

Sobha Chikkagubbi Location

The Sobha Chikkagubbi location spans listed survey parcels in Kannur and Chikkagubbi villages, Bidarahalli Hobli, Bengaluru East Taluk, Bengaluru Urban District. Locality research groups Chikkagubbi with the Hennur Road residential micro-market, so the project is described here as near Hennur Road rather than directly on it. A confirmed project entrance and road frontage have not been established. This dual-village description is important for map searches because buyers may encounter the project under Chikkagubbi, Kannur, Kannur Road, Hennur Road or the broader Bengaluru East label. The map is centred on the representative project coordinate used in the current intelligence handoff, not a confirmed entrance or sales-office gate.

Ten Google Maps driving-route observations dated 19 August 2026 now provide approximate orientation distances from the representative project coordinate. They cover daily needs, education, healthcare, employment, regional road access, airport access and rail. These are not travel-time promises and the origin is not a confirmed project entrance, so recheck priority journeys from the current gate before travelling.

The wider planning context refers to SH 104, R K Hegde Nagar, Doddagubbi Lake and the Bagalur-side landscape context. The master plan itself shows principal roads, internal circulation, water-edge relationships and more than one functional zone across a long site. That means the practical journey from a selected residential block may differ from a pin placed at the overall project coordinate.

For a site visit, first request the current Sobha Chikkagubbi address and gate pin. Then test peak-hour routes toward the airport, employment areas, schools, hospitals and everyday retail that matter to the household. Verify road access, public-transport options, pedestrian conditions and the final approach independently rather than relying on a single map result.

Map centred on a representative project coordinate · confirm the current entrance before travelling.

Connectivity highlights and approximate distances
CategoryLandmark / destinationApprox. distance
Daily needsBhartiya City~3.4 km
EducationKristu Jayanti University~4.9 km
EducationVIBGYOR High School Hennur~6.1 km
HealthcareCratis Hospital~5.4 km
HealthcareManipal Hospital Hebbal~12.4 km
EmploymentManyata Tech Park~9.0 km
Regional roadHebbal Flyover~15.3 km
AirportKempegowda International Airport Terminal 1~20.9 km
RailThanisandra Railway Station~6.5 km
RailYelahanka Junction Railway Station~9.6 km

Approximate Google Maps driving distances observed 19 August 2026 from the representative project coordinate, not a confirmed entrance. Routes and access can change; recheck before travel.

Sobha Chikkagubbi FAQs

identityIs Sobha Chikkagubbi the official project name?

Sobha Chikkagubbi is the project name used by this information site. The official announced project name is not published here; match the current registration and project documents before relying on a name.

configurationWhich home configurations are planned?

The current mix lists 1 BHK Serviced Apartment, 1 BHK, 2 BHK Luxe, 2 BHK Grande, 2 BHK + Home Office, 3 BHK Luxe, 3 BHK Grande, 4 BHK Luxe with three bathrooms, and 4 BHK Grande with four bathrooms.

project-scaleHow large is the proposed development?

Current project information describes approximately 50.45 acres, 4,463 planned homes and 13 towers or blocks rising up to 42 floors.

locationWhere is the proposal located?

The proposal spans listed parcels in Kannur and Chikkagubbi villages, Bidarahalli Hobli, Bengaluru East Taluk, Bengaluru Urban District. The map uses a representative coordinate rather than a confirmed entrance.

pricingWhat is the current Sobha Chikkagubbi price?

Current project-specific prices and availability are not published here. Request a dated unit-specific cost sheet from a verified responsible entity for the selected configuration.

timelineWhen is launch and completion planned?

A research-based estimate suggests a Q2 2027 launch window and a 48-month completion period based on prior builder cadence. These are planning projections, not announced or confirmed project dates.

document-checkWhy do the stated unit totals differ?

The nine configuration rows total 4,397 homes, including 100 serviced apartments, while the overall project figure is 4,463. The current documents do not explain the 66-unit difference, so request a reconciled schedule.

infrastructureWhat project infrastructure is described?

The project information refers to an on-site sewage-treatment system using an activated-sludge process, dual plumbing, treated-water reuse, rainwater harvesting, green-cover allocation and a tree-planting programme. Confirm the final approved design and delivery status in current technical documents.

buyer-diligenceWhich documents should buyers compare?

Match the official project name, current Karnataka registration, master plan, unit drawing, area schedule and dated cost sheet to the same phase, tower and home before making a decision.

Contact us

Request Sobha Chikkagubbi project details and current document availability.